NorCE Offshore PTE LTD
- Offshore Derrick Laying Work Barge NorCE Endeavor [Contract No. PRO-J-PUR-006]
This project involved the building of an offshore work barge commissioned for heavy lifting with a permanent crane capacity of 1040 tons. PT CIME was tasked with fabrication, installation, pre-commissioning and commissioning of all electrical and instrumentation work. Project included engineering, procurement of materials, yard fabrication, design modification and highly coordinated site installation with all contractor disciplines.
PT. MEINDO ELANG INDAH
- Well Connection Tunu Project Phase 12 [Contract No. MEP-000005]
Interconnection for entire Tunu Phase 12 Instrumentation Works.
This contract addressed quad slot types of well installations in client’s SPU field areas (Adjacent wells GTS Ax and Dx). The supply and placement of technology required planning, detailed engineering, hook-up fabrication, and WHCP fabrication including assembly FAT and SAT. The construction and installation process further included personnel and equipment logistics, site installation, inspection, pre-commissioning and commissioning of the new site plant. The PT CIME team remained on field standby during contract duration from our present site workshop centrally located to service field-wide instrumentation requirements.
TOTAL E&P INDONESIE
- CONSTRUCTION SUPERVISION SERVICES TUNU FIELD DEVELOPMENT PROJECT [Contract No. 4500003138]
Provide qualified Construction Supervisors for Electrical & Instrumentation for Tubu Field Development Project Phase 10, including Commissioning Consumables, Mob - Demob, MCU, HSE Training and PPE.



